Construction site at dusk

Snagging software without the chaos.

Capture issues on-site, assign them to the right contractors, track progress and create professional snagging reports from one organised platform.

Start Free Trial

7-day free trial · No credit card required

Riverside Court

Project dashboard

New snag

Open

18

In progress

11

Complete

29

Overdue

4

Completion by trade

Electrical82%
Painting64%
Plumbing45%
Carpentry30%
  • Tom Fitzgerald, Painter (sample profile)

    Seal gap around window frame

    Apt 204 · due 14 Mar

    open
  • Ciaran Walsh, Electrician (sample profile)

    Socket faceplate misaligned

    Apt 106 · due 12 Mar

    in progress
  • Tom Fitzgerald, Painter (sample profile)

    Paint finish incomplete

    Hall 2F · due 09 Mar

    overdue
Capture issues directly on-site
Assign responsibility clearly
Track every snag through completion
Keep photographs and updates together
Produce organised handover reports

The SnagCore workflow

From site inspection to signed-off completion.

Five connected stages that mirror how snagging actually happens on a live construction project.

  1. Step 1 of 5

    Capture

    Photograph and record a snag directly on-site with the project, location, category, priority and due date attached.

    snagcore.com/app

    New snag

    Riverside Court

    Issue title

    Seal gap around window frame

    Description

    Gap between frame and plaster, needs sealing and making good.

    Priority

    High

    Category

    Carpentry

    Building

    Block B

    Floor

    Level 2

    Room

    Apt 204

    Assignee

    Tom Fitzgerald, Painter (sample profile)Tom Fitzgerald

    Due date

    14 Mar 2026

    Photos

    Sample snag photograph: unsealed gap around a window frame
    Save snagCancel
    New snag dialog (sample data)
  2. Step 2 of 5

    Assign

    Send the issue to the responsible contractor or team member with a name, trade role and deadline, so ownership is never in doubt.

    snagcore.com/app

    Socket faceplate misaligned

    Riverside Court · Snag #148

    in progress
    Ciaran Walsh, Electrician (sample profile)

    Ciaran Walsh

    Electrician · assigned 6 Mar

    Location

    Block A · Level 1 · Apt 106

    Due

    12 Mar 2026

    Priority

    Medium

    Sample snag photograph attached to the assignment
    Snag assignment (sample data)
  3. Step 3 of 5

    Track

    Follow every snag through open, in progress and complete, with overdue items surfaced on the dashboard.

    snagcore.com/app

    Snags

    Riverside Court · 42 items

    Search Filters

    Open

    18

    In progress

    11

    Complete

    9

    Overdue

    4

    AllOpenIn progressCompleteOverdue
    • Tom Fitzgerald, Painter (sample profile)

      Seal gap around window frame

      Painter · Apt 204 · due 14 Mar

      open
    • Ciaran Walsh, Electrician (sample profile)

      Socket faceplate misaligned

      Electrician · Apt 106 · due 12 Mar

      in progress
    • Tom Fitzgerald, Painter (sample profile)

      Paint finish incomplete

      Painter · Hall 2F · due 09 Mar

      overdue
    • Priya Nair, Contractor (sample profile)

      Scratched kitchen cabinet door

      Contractor · Apt 311 · due 18 Mar

      open
    • Lena Kowalski, Plumber (sample profile)

      Bathroom silicone requires finishing

      Plumber · Apt 208 · due 07 Mar

      complete
    Snags list with status filters (sample data)
  4. Step 4 of 5

    Verify

    Review completed work with before and after photographs kept alongside the original issue and its history.

    snagcore.com/app

    Seal gap around window frame

    Block B · Level 2 · Apt 204

    complete
    Sample photograph before repair: unsealed window frame gap
    Before
    Sample photograph after repair: neatly sealed window frame
    After
    Tom Fitzgerald, Painter (sample profile)

    Tom Fitzgerald

    Painter · completed 13 Mar 2026

    Approve Reopen
    Before and after comparison (sample data)
  5. Step 5 of 5

    Report

    Export an organised PDF report for clients, contractors and handover, generated from the live snag data.

    snagcore.com/app
    SSnagCore

    Snagging report · 15 Mar 2026

    Riverside Court, Block B

    Total snags

    42

    Complete

    29

    In progress

    9

    Open

    4

    • Seal gap around window frame

      Apt 204 · Tom Fitzgerald

      complete
    • Paint finish incomplete

      Hall 2F · Tom Fitzgerald

      overdue
    • Socket faceplate misaligned

      Apt 106 · Ciaran Walsh

      in progress

    Page 1 of 6 · generated from live snag data

    Exported PDF report (sample data)

Built for the way work actually happens on site.

Snags get logged where they are found, on a phone or tablet, with the photograph, location and trade attached before anyone leaves the room.

Site manager reviewing a snag list on a phone during a site walk
Site walk, phone in hand
Misaligned electrical socket marked during a site inspection
Evidence at the point of work
Project manager reviewing snag progress on a tablet in an unfinished interior
Progress review on a tablet
Close-up of a completed repair around a window frame
Completed and verified

Everything in one place

The toolkit your site has been waiting for.

Replace spreadsheets, screenshots and scattered message threads with one organised system that everyone on site can use.

Photo-first capture

Attach photographs as you log the issue, stored privately against the snag.

Sample defect photograph attached to a snagSample completed repair photograph attached to a snag

Snag lists that work

Every item carries a project, location, category and priority, so a long list stays readable.

  • Seal gap around window frameopen
  • Socket faceplate misalignedin progress
  • Bathroom silicone finishingcomplete

Assign to trades

Record the responsible person, their trade role and a due date on each snag.

  • Ciaran Walsh, Electrician (sample profile)Ciaran WalshElectrician
  • Lena Kowalski, Plumber (sample profile)Lena KowalskiPlumber
  • Tom Fitzgerald, Painter (sample profile)Tom FitzgeraldPainter

Inspection mode

Walk a unit item by item, offline if needed, and sync when you are back on signal.

Site manager working through an inspection on a phone

PDF reports

Export a report built from the live snag data, with your branding on Pro and Team.

Riverside Court15 Mar 2026

Project analytics

Open, in progress, completed and overdue counts, plus priority breakdown per project.

Notifications

In-app alerts for the changes that concern you, instead of a group chat for everything.

Snag assigned to you

Snag marked complete

Due date approaching

Search and filter

Find any issue by keyword, status or priority across a project's snag list.

AllOpenIn progressCompleteHigh priority

Mobile-first

Designed for hard hats and gloves: big tap targets and short forms in the browser.

Your first project can be set up in minutes.

SnagCore runs in the browser on desktop, tablet and phone. The mobile layout is built for use on site, and inspection mode keeps working when the signal drops, syncing once you are back online.

  1. 01

    Create your SnagCore account

    Sign up with an email address and password. The 7-day free trial starts straight away, with no card required.

  2. 02

    Set up your first project

    Add the project name, client and site details, then start building your snag list against it.

  3. 03

    Invite your team

    Add colleagues to the workspace and set their role, so everyone sees the work that belongs to them.

  4. 04

    Start capturing and assigning issues

    Log snags with photographs, assign them to the responsible trade, and track them through to completion.

Start Free Trial
Project manager reviewing snag progress on a tablet on site

Simple, fair pricing

Start free. Upgrade when your team grows.

Starter

For solo tradesmen and small jobs.

180/yr

Just €15/mo · Save €48 a year

  • 1 user
  • 3 active projects
  • Unlimited snags
  • Photo capture and PDF reports
  • Inspection mode with offline capture
Most popular

Pro

For growing builders and site managers.

468/yr

Just €39/mo · Save €120 a year

  • Everything in Starter
  • Up to 10 users
  • Unlimited projects
  • Custom report branding
  • Project analytics
  • Checklist templates and handover sign-off

Team

For developers and large contractors.

1140/yr

Just €95/mo · Save €288 a year

  • Everything in Pro
  • Unlimited users
  • Role based permissions
  • Contractor accounts for assigned work

Questions, answered

More detail on plans and billing or what SnagCore does.

Run your next site without the chaos.

Capture snags on site, assign them to the right trade and hand over with a report that matches the work actually done.

Start Free Trial

7-day free trial · No credit card required